Detected peak start against the official window
From the README, verbatim: the online adaptive-threshold detector with CapyMOA ADWIN, Kaggle run recorded in outputs/D_drift_findings.md.
| Stop | Period | Detected start (weekday) | Official | Weekend shift |
|---|---|---|---|---|
| Lapa Station | AM | 06:10 | 06:00 | +10 min |
| Salvador Bus Station | PM | 17:05 | 17:00 | +48 min |
| Lacerda Elevator | PM | 17:06 | 17:00 | +80 min |
| Shopping mall | PM | 15:57 | 17:00 | +193 min |
| Castro Alves Theater | PM | 17:21 | 17:00 | +89 min |
Every day's detected start
One mark per day for the same five series. At every one of these stops the weekend peak starts later than the weekday peak, which is the real variation in this window. weekday weekend or holiday; a larger mark is several days at the same time
Per-day starts from the local run in outputs/boundary_points_real.csv; its day counts differ slightly from the Kaggle run in the table above.
Does anything drift? Not at the right granularity
CapyMOA ADWIN on the online regressor's error, per stop. Fed every 5-minute error, it alarms dozens of times because it tracks the daily demand cycle. Fed the per-day RMSE, it finds no drift day at any stop, which matches the boundary series.
From outputs/role_d_concept_drift.csv, the CapyMOA run.
The timetable's busiest time against demand
Weekday gap between the busiest scheduled arrival time in the GTFS timetable and the detected demand peak. Most demand peaks come later than the service peak.
From outputs/schedule_alignment.csv; demand peaks from the local run. Stops without enough demand to show a peak are left out.